Calculation of metal structures is carried out in accordance with the requirements of construction standards and standards. This stage is key in preparing permission to industrial and assembly work. Engineers and appraisers use different formats when reporting. It is important to take into account that other specialists will have to familiarize themselves with the documents, therefore, even in the absence of a specific calculation algorithm, it is necessary to adhere to a certain logic, structural accessibility and completeness of the initial data. This will ensure the smooth passage of materials through the controlling authorities, will make it possible to draw up estimates as accurately as possible and determine the project for compliance with construction requirements
The recommendations of such specialists as the employees of the design bureau of the plant LLC PPK Zelenaya Kaska are that it is necessary to prepare a calculation that eliminates the need to search for additional tabular or actual materials. At the same time, the main requirement is the logical structure and ordering of information. The company’s steel structures have been designed and calculated according to such principles for many years. During this entire period, there were no complaints from expert commissions or other departments of the enterprise. A convenient structure provides a substantive dialogue with their representatives without spending working resources on finding the right sections or values.
For each specific project, it is necessary to make calculations based on specific engineering solutions and conditions at the construction site. It is obligatory to have a signed terms of reference and a load report, including certificates from the Main Interregional Center of Rosstat, a description of weather and climatic conditions, as well as the landscape of the area. Engineers and experts must also be aware of the assumption that the allowable loads on the frame of steel profiles are overestimated.
The calculation must include a construction diagram and drawings of individual modules. Steel structures are mounted from many individual beams, so it is mandatory to put down dimensions, mark and describe assembly specifications. Calculations will be most complete if the schemes of external and structural loads are attached, as well as if there is a detailed 3D model of the construction object with the preservation of the electronic version.
Specialists who have long established themselves in this industry also send calculations on dynamic calculations to the controlling organizations. Engineers of the plant LLC PPK Zelenaya Kaska prepare special presentations that allow predicting operational precedents. This avoids deformation of the structure, destruction or corrosion of materials.